Facade Construction
Delft-Rotterdam 2008

The facade design had to be translated into a material prototype within a predetermined budget. After the courses welding, milling and machine instruction, the protoype was made within one week.

Steven Goeman, Architectural Engineering, February 2012 cv   |   contact